This project, completed in 2006 comprised a high specification and flexible space to house offices, reception and various multi-media suites alongside IT servers, storage space and staff areas. The project value reached £2.8million.
This project utilised innovative techniques that were particularly forward thinking at the time of completion. Alongside providing space for hot-desking, the whole site had secure wireless capability and a complex building management system.
The nature of the building called for raised computer floors throughout to aid maximum flexibility and a significant on-site data bank for future proofing.
One of the more complex electrical systems to be introduced was the uninterruptible power supply, in place to protect the services and equipment in the event of a mains grid power failure.